What is a premature collapse?
Premature collapse of the structure is one of the main causes of serious injury resulting from demolition activities. The most common for this type of incident is the lack of effective planning before the commencement of the demolition process.
Premature collapse overview
Premature collapse of the structure is one of the main causes of serious injury resulting from demolition activities. The most common for this type of incident is the lack of effective planning before the commencement of the demolition process.
The pre-demolition survey, a detailed site risk assessment and the development of a comprehensive method statement. Premature collapse usually begins with the structure collapse of floors and is often caused by plant operating on floors which are not certified safe and/ or back-propped where required.Â
It can also be caused by poor site supervision and lack of instruction, training and information for the workforce.
This will sometimes lead to individual worker’s or teams being unaware of additional hazards which have been created as the demolition work progresses.
A fully competent and trained workforce that has been made completely aware of the hazards associated with a particular site should lead to a successful conclusion to the demolition project.
What is demolition?
The process involves Rotational hydraulic shears and rock-beakers attached to specialist excavators are also used to cut or break through wood, cut steel and crush concrete which reduces the structure to a rubbleÂ
What is a premature collapse?
Premature collapse of these structures is one of the main causes of serious injuries resulting from demolition activities. The most common type of incidents is the lack of planning before commencement
Demolition hazards
If a demolition project is well planned the risks of injury and death can be minimised. It should be emphasised that the planning and execution of a demolition project should only be done by appropriately competent persons.
What is a section 80 demolition notice?
If your considering demolishing an existing building you will need to submit a demolition, Section 80 Notice together with your (RAMS) to your local authority according to section 80Â
What is a pre-demolition survey
When a building is to be demolished the (non-domestic) client (usually the property owner) has a duty to provide pre-demolition information to the designer and contractor. This will involve a pre-demolition investigation and survey.Â
How to manage asbestos in demolition
One of the key issues arising in demolition these days is asbestos. Widely used in construction projects by previous generations, asbestos is now accepted as the UK’s largest occupational killer and there are strict guidelines for the safe removalÂ
House demolition in Manchester
Why let your house demolition efforts feel stressful. We have over 50 years experience in house demolition in Manchester, we are able to deliver a variety of demolition and development services throughout Greater Manchester.Â
What is manual demolition?
Among the methods, manual demolition is found to be most applicable for most sites, especially for areas located in the urban zone. The safety of the demolition process would greatly depend on the type of procedure used.
What is non-explosive demolition?
You do not need explosives for every demolition job. Most people assume that for a demolition to be a demolition there is a need for a kaboom. It does not have to be that way
Structural demolition
Structural demolition is not a walk in the park. Total Group is well placed to deliver a safe, environmentally friendly and a budget wise project. We focus on a process that will assist you to salvage and recycle material for reuse.
What is high risk demolition?
The building contractor needs to make a thorough risk assessment to look for both risks and hazards. Control measures are then implemented to prevent any accident that could be fatal.Â
Controlled demolition methods
If you have a large building that requires demolishing, you cannot rely solely on manual demolition to get the project completed. There is only so much that a team of demolition contractors.
Ready to start your project ?
Let's Work Together
Please complete the form below and someone from the Total team will be in touch.